Energy


CTE EL-TO Zagabria

  • Engineering support
  • Drawing FCD for adjustment command and control

CTE Marghera Azotati

  • Automation system migration

CTE Turbigo

  • Automation system migration

CTE Ravenna

  • Control system virtualization

CTE Marghera Levante

  • Engineering support
  • Drawing FCD for adjustment command and control

CTE Butia

  • Design specification
  • Instrument list
  • Data sheet
  • Instrument hook-up
  • Instrument location plant
  • I&C cables list
  • Signal list
  • Drawing FCD for adjustment command and control

CTE Termoli Control system revamping

  • Reverse engineering
  • Software Configuration for DCS
  • Commissioning

CTE Sparanise and Rizziconi Flexibility plant

  • Software Configuration for DCS
  • Commissioning

CTE Novara steam production

  • Functional description
  • Software configuration for DCS
  • Commissioning

CTE KOCAELI GEBZE

  • I/O list
  • Drawing IFCD for adjustment and control
  • Drawing IFCD for command, alarm, protection
  • HW configuration (layout cabinet , Electrical switch gear diagrams)
  • Assistance on site

CTE SOUSSE Gr. C

  • I/O list
  • Drawing IFCD for adjustment and control
  • Drawing IFCD for command, alarm, protection

CTE Torino Nord

  • I/O list
  • Drawing IFCD for adjustment and control
  • Drawing IFCD for command, alarm, protection
  • Software for DCS
  • Graphical display
  • Commissioning
  • Assistance on site

CTE S.Severo

  • I/O list
  • Drawing IFCD for adjustment and control
  • Drawing IFCD for command, alarm, protection
  • Assistance on site

CTE Bayet

  • I/O list
  • Drawing IFCD for adjustment and control
  • Drawing IFCD for command, alarm, protection
  • Assistance on site

CTE Aprilia

  • I/O list
  • Drawing IFCD for adjustment and control
  • Drawing IFCD for command, alarm, protection
  • Assistance on site

CTE Nevinnomysskaya

  • Software for DCS
  • HW configuration (layout cabinet , Electrical switch gear diagrams)

CTE Puente Nuevo

  • I/O list
  • HW configuration (layout cabinet , Electrical switch gear diagrams)
  • Software for DCS
  • Graphical display
  • Commissioning

CTE Vasilikos

  • I/O list
  • Instrument list
  • Data sheet
  • Instrument and control cable
  • Material Take off
  • Instrument location plan
  • Hook-up
  • Loop diagrams
  • Control and logic diagram

CTE Moncalieri

  • I/O list
  • Drawing IFCD for adjustment and control
  • Drawing IFCD for command, alarm, protection
  • Software for DCS
  • Graphical display
  • Commissioning
  • Assistance on site

CTE Ferrera Erbognone e Mantova

  • Software for DCS
  • Commissioning
  • Assistance on site